Prices

Service Unit Price/eur
Floors

 Subfloor installation (OSB3)

 m²

30.00

Floor leveling with self-leveling compound up to 50mm

 m²

 12.00

Skirting installation

m

 6.00

Vinyl floor installation (Herringbone Pattern)

20.00

Three-layer parquet (laminate type)

  m²

 14.00

 Laminate floors

  m²

10.00

 Carpet and linolium 

                        m²

10.00

 
Walls and ceilings

 

 

Ceilings and walls priming

3.00

Ceilings and walls plastering x2, sanding (before painting)

 m²

15.00

Ceilings and walls plastering, sanding (before hanging wallpaper)

10.00

Wallpaper removal

4.00

Hanging wallpaper

 m²

 8.00

Tiling

 m²

45.00

Ceiling and floor hydroisolution

 m²

12.00

Dropped ceiling

 m²

 14.00

Reinforcement of walls and ceilings with fiberglass mesh 

 m²

 12.00

Ceiling and walls painting x2

 m²

6.00

Crown molding installation

m

7.50

Doors and windows

Door installation

per unit

120.00

Door removal 

per unit

30.00

Doorway and window sides repair

m

15.00

Drywall

Drywall ceilings

18.00 

Drywall (walls)

15.00 

Drywall partition (two layers)

24.00

Drywall mounting on glue

10.00 

Plumbing

   

Washing machine installation

per unit

40.00

Wall hung toilet bowl

per unit

140.00

Traditional toilet

per unit

60.00

Shower cabin

per unit

150.00

Sink installation

per unit

60.00

Shower mixer

per unit

50.00

Sink mixer

per unit

40.00

Electrical installation work

   

Electrical outlet and switch installation

per unit

8.00

Lighting appliances, lamps and light fittings per unit 40.00

 *The prices may vary depending on the specification of the premises, the volume and the complexity of the work, if your work is not on the list, please contact the supervisor. +37129747569 

 ws fr.png

Prices shown above doesn't include VAT

Service Unit Price/eur
Floors

 Subfloor installation (OSB3)

        m²

 30.00

Floor leveling with self-leveling compound up to 50mm

        m²

 12.00

Skirting installation

        m

 6.00

Vinyl floor installation (Herringbone Pattern)

        m²

 20.00

Three-layer parquet (laminate type)

       m²

 14.00

 Laminate floors

       m²

 10.00

 Carpet and linolium 

       m²

 10.00

 
Walls and ceilings

 

 

Ceilings and walls priming

       m²

3.00

Ceilings and walls plastering, sanding (before painting)

       m²

15.00

Ceilings and walls plastering, sanding (before hanging wallpaper)

       m²

10.00

Wallpaper removal

       m²

4.00

Hanging wallpaper

       m²

 8.00

Tiling

        m²

45.00

Ceiling and floor hydroisolution

        m²

12.00

Dropped ceiling

        m²

 14.00

Reinforcement of walls and ceilings with fiberglass mesh 

        m²

 12.00

Ceiling and walls painting x2

        m²

6.00

Crown molding installation

        m

7.50

Doors and windows

Door installation

per unit

120.00

Door removal 

per unit

30.00

Doorway and window sides repair 

      m

15.00

Drywall

Drywall ceilings

       m²

18.00 

Drywall (walls)

       m²

15.00 

Drywall partition (two layers)

       m²

24.00

Drywall mounting on glue

      m²

10.00 

Plumbing

   

Washing machine installation

per unit

40.00

Wall hung toilet bowl

per unit

140.00

Traditional toilet

per unit

60.00

Shower cabin

per unit

150.00

Sink installation

per unit

60.00

Shower mixer

per unit

50.00

Sink mixer

per unit

40.00

Electrical installation work

   
Electrical outlet and switch installation per unit 8.00
Lighting appliances, lamps and light fittings per unit 40.00